Roseberry Creek Project Stats

  • Watershed: Holston River
  • Ecoregion: Ridge and Valley
  • Project Length: 2,340 linear feet
  • Credit Produced: 1,900
  • Completion Date: March 2008

Roseberry Creek

Project Description

The Roseberry Stream Restoration Project was approximately 2,340 linear feet of stream restoration and enhancement on three unnamed tributaries to Roseberry Creek near Corryton, Knox County, Tennessee. Goals for the project included: 1) improving aquatic habitat by introducing riffle–pool sequences, adding large woody debris in the form of root-wads, log sills, and log vanes, and 2) restoring a native bottomland hardwood riparian forest along the project. Native trees and shrubs were planted along the riparian corridor to provide a diversity of forest structure, wildlife forage value, filtering capacity, soil stability, and riparian habitat. Construction of riffle-pool sequences using native substrate material has improved aquatic habitat diversity. A weir dam was removed from the main channel that interrupted sediment transport, impounded stream flows and functioned as a fish barrier. Floodplain wetlands were enhanced by plugging drainage ditches and planting native trees. 

 

 

 

Before 

 

 

 

 

After